40 FOOT CONTAINERIZED COLD ROOM | Sheffield Africa Kenya
Total Surface Area(sq.m) : 96.2855
Total Volume (Cubic.m) : 66.8293
Running meters : 28.8
Item No : null
Model No : CCR3
Brand :
Category : CONTAINERIZED COLD ROOMSThis is a 40 foot containerized cold room, supplied complete with 100 mm insulated panels, epoxy floor, condensing unit, evaporator, control panel and insulated door. It holds 66.8 cubic metres.
Walls and roof are 100 mm polyurethane foam panels clad in pre-painted galvanised iron, over a scratch-resistant epoxy floor that is seamless and easy to clean. A microprocessor control panel handles temperature, automatic defrost, phase failure and over-current protection. Sheffield installs, tests and commissions the room, trains the staff who will use it and hands over an FMC plan.
| Length | 12.05 m |
| Width | 2.35 m |
| Height | 2.36 m |
| Total Surface Area(sq.m) | 96.2855 |
| Total Volume (Cubic.m) | 66.8293 |
| Running meters | 28.8 |
| Supply of Panels | |
|---|---|
| Polyurethane Foam (PUF) Wall and roof 100MM Thick | |
| Monolithic sandwich construction which is the most advanced, ensures best insulation and uniform structure. | |
| Cladding material is Pre-painted Galvanized Iron (PPGI) | |
| Injected Density | 42 Kg/m3 |
| Thermal conductivity | 0.18 – 0.28 W/m2k |
| Modulus of Elasticity Kg/cm2 | 40 – 70 Kg/cm |
| Compression Strength Kg/cm2 | 1.7 – 2.2 Kg/cm2 |
| Breaking Elongation | 5 – 10% |
| Water Absorption | 1.7 – 2.3 Δp/V |
| Operation Temp | -60 - +90C |
| Floor Type | |
| Epoxy Floor Type | |
| 0.3 mm thick layer of Epoxy with 80MM thick PUF Insulation | |
| Scratch Resistant | |
| Seamless and easy to clean | |
| Civil Screeding in Client Scope | |
| Condensing Unit | |
| Condensing unit-air cooled SLIM--ICL09AH (2 units) | |
| Cooling Capacity- 9315 BTU/Hr (2.73 kW) Low power consumption | |
| Bitzer | Semi Hermetic Reciprocating compressor type |
| R404a Refrigerant | |
| Air Cooled Aluminum Fin & Copper Tube Type | |
| 8 Deg.C Evaporating Temperature & 50 Deg.C Condensing temperature. | |
| 220 v/ 50 HZ/ 3 PH Connected Load 3.28 kW | |
| Unit Body; Aluminium, PU type Powder Coated, Corrosion resistant and nice appearance. | |
| Evaporator | |
| Ceiling Mounted Evaporator Unit /HEAT EXCHANGER -A4018303H - Body Size -58" x 13" x 16" | |
| Fan Nos | 3; low-temperature resistance axial fan motor with internal terminal box. |
| 300 mm fan diameter | |
| Heater Defrost cycle that is leak proof. | |
| Unit Body; Aluminium, PU type Powder Coated, Corrosion resistant and nice appearance. | |
| Maintenance; Compact, adjustable & easily openable side panels for easy installation. | |
| Control Panel | |
| Control Panel | Standard Control Panel equipped with Microprocessor based controller cum indicator along with required electrical / electronic components |
| Temperature Controls for Positive temperature applications with LED Indicator lights. | |
| Phase failure Prevention mechanism | |
| High pressure / low pressure control mechanism | |
| Over current protection | |
| Auto Defrost mechanism | |
| Delay timer | |
| Solenoid valves | |
| Standard Control Panel equipped with Microprocessor based controller cum indicator along with required electrical / electronic components. | |
| Insulated Door | |
| Insulated Swing Door Type | |
| 100 mm thick Polyurethane Foam panels with door heater provision | |
| Heavy duty hardware | |
| Gasket to seal off air leaks | |
| Safety Release Handle from inside for safety | |
| Electrical materials | |
| Refrigeration and Electrical Switch Gear. | |
| Electrical connections and materials | |
| Refrigeration Copper pipework | |
| Armoflex Copper Pipe insulation material | |
| Refrigerant | R404a. |
| Electronic controls. cable trays, flarenuts | |
| Weather Proof Lighting, Electrical controls. | |
| Interconnecting Material | |
| Installation, testing and Commissioning. | |
| Consumables and Steel Supports - U-channels, PVC internal Angle Lines (75 X 75 MM), PPGI Flashing (50 X 150 MM) | |
| Mounting channels. | |
| Defrost drainage mechanism | |
| Brackets. | |
| Wall assembly materials | silicon, mounting Channels |
| Labor setting to work and commissioning | |
| Installation Cost (labor setting to work and testing) | |
| labor setting to work and testing | |
| Test Run the machine and observation. | |
| Training and Handover with the staff who will use the cold room. | |
| Do's and Don'ts training. | |
| Handover the Key | |
| FMC Plan. | |